Concrete parking lot building in Redmond WA - a lot that drains and holds up for years

Potholed gravel or a cracked lot that holds puddles? We build a concrete lot planned around your drainage, your schedule and your business.

Stamped concrete patio beneath a wooden pergola beside a brick house, with square tile-like patterns across the surface.

What does it take to build a concrete parking lot in Redmond?

Concrete parking lot building in Redmond means turning dirt, gravel or worn-out paving into a concrete surface for parking, built on a dug-out, packed base and sloped so rain runs off instead of sitting where people park. Done right, it takes years of daily cars with less upkeep than asphalt.

Most lots we're called to are gravel that's gone to potholes, or an old slab that's cracked, sunk in spots and holding water right where people step out of their cars. The price moves with the size of the lot, what has to come out first, how much base work the ground needs, how thick the concrete has to be for what parks on it, and extras like curbs or drains. If there's an old slab in the way, concrete cutting is often where the job starts. The schedule turns on the city's review, the weather and how long you can do without the lot, and your own figure comes from the on-site estimate, once I've seen what's there.

How we handle concrete parking lot building

For a lot, I start with two questions: how long you plan to use it, and how long you can keep it closed. The first decides whether concrete is even the right call, and I'll tell you straight when asphalt makes more sense for your plans, while the second sets the schedule, so we plan the work around your business. Then we look at where the water runs now and why the old surface failed, because a lot that holds puddles today will hold them in concrete too if nobody fixes the cause. We dig out the soft ground and pack the subgrade, the layer the slab sits on, so it holds up under parked cars instead of settling, and set the forms so the surface falls away from the building. Rebar, the steel that holds a slab together, goes in where the traffic calls for it. We pour early in the day to stay out of the midday heat that leaves a weak, dusty top, give it a broom finish, a light ridged texture so tires and shoes grip when it's wet, and cut control joints, shallow grooves that tell the slab where to crack, before it picks its own spots. Then we clean up and leave it to cure.

Some lots need more than a slab. Light poles, signs, a carport or a short wall at the edge usually sit on concrete footings, and it's easier to pour those while the site is open than to cut into a new lot later. If the building beside the lot has settled and the doorway no longer lines up with the grade, we'd rather look at foundation raising first, because pouring a new lot up to a sinking building just sets the problem in concrete.

New lot over dirt or gravel

This suits a property where cars already park on gravel that turns to mud and potholes every winter. We dig down to firm ground, build a packed base and slope it, because gravel lots usually fail from water and a soft base, not from the cars.

Replacing an old lot, in sections if needed

This suits a lot that's cracked, sunken or holding water, where patching has stopped keeping up. We break out and haul away the old surface, find out why it failed before we pour, and can split the work so part of the lot stays open while we build the rest.

Why Redmond property owners call Groundbreak Redmond Concrete Company about their lot

I do the estimate, our crew does the work

I come out for the estimate myself, so the person pricing your lot is the one who'll be on site when it's built. Our own crew does the work with me running the job, so what you tell me at the estimate doesn't get lost by pour day.

Since 2013, digging into why concrete failed

We've been at this since 2013, and I learned a lot of it breaking up old slabs to see why they gave out. Usually it's what's underneath or where the water goes, so that's where I look first before we price anything new.

Licensed and insured, and you can check

We're licensed and insured. You don't have to take my word for it, because the state's contractor lookup shows whether a business has an active registration and paid-up workers' comp for its crew. Look us up, then call (425) 285-8618 and I'll come see your lot.

Get a free on-site estimate for your parking lot

We reply within one business day to set a time, then I come out, walk the lot with you and give you an estimate with no obligation. It helps to have the rough square footage, what's on the ground now and the dates you're aiming for.

Location
Redmond, WA 98052
Hours
Mon–Fri: 8 AM–11 PM, Sat–Sun: 7 AM–11 PM

Concrete parking lot building in Redmond and what the city asks for

The City of Redmond requires a permit and approved plans when a project creates or replaces 2,000 square feet or more of hard surface, and most lots are bigger than that. The city counts more than people expect. Turning dirt or gravel into concrete counts as new hard surface, tearing old paving out down to the base layer underneath counts as replaced, and both fall under the city's stormwater rules once a project is big enough. Even pervious concrete, a mix with open gaps that lets water through, still counts as hard surface. Before we set a date, we find out which office covers your address and what your lot calls for, then tell you plainly who'll handle the permit and the inspections.

The calendar matters as much as the paperwork. Work expected between October 1 and April 30 needs a city-approved wet weather plan for keeping mud and silt from washing off the site, and the city says clearing and grading review generally takes 4 to 5 weeks, so a lot you want open by spring needs planning well ahead of it. We're based in Redmond and build lots the same way in Kirkland, Bellevue and the cities around them, and if yours isn't on our pages, just ask. Around here we mostly see gravel lots behind small shops that turned to soup after a few wet winters, and older lots where the water was never given anywhere to go.

Questions about concrete parking lots in Redmond

How much does a concrete parking lot cost in Redmond, WA?

Across the US, building a concrete parking lot usually costs about $5 to $10 per square foot, and that's a national guide price for the work, not ours. Your Redmond figure comes from the on-site estimate, once I've seen what's there now and what the ground needs. Call (425) 285-8618 to set one up.

Is a concrete parking lot worth the extra cost over asphalt?

It usually is if you'll keep the lot a long time. Asphalt typically costs 20 to 40 percent less up front, but concrete lasts about 25 to 40 years against 15 to 25 for asphalt, and over 30 years or more concrete often matches or beats it on total cost. If you expect to sell or redo the property sooner, asphalt can be the smarter spend.

How long does it take to build a concrete parking lot?

Building a parking lot usually takes about 2 to 4 weeks, depending on its size, how many features it has and the site itself. Bad weather or a material shortage can stretch that, so leave some slack around your business plans. The city's review time, covered above, comes before any of it.

How long before cars can park on a new concrete lot?

Plan on keeping cars off for at least 7 days while the concrete cures, which is the slow hardening it does after the pour. It keeps gaining strength until about 28 days, so close the lot or arrange other parking for at least that first week. If you can't close everything at once, building in sections helps.

How long do the joints in a concrete parking lot last before resealing?

Hot-poured sealant usually lasts about 3 to 8 years in concrete pavement joints, silicone about 8 to 10, and preformed seals up to 20. Preformed costs the most and hot-poured the least, so the choice comes down to paying more now or resealing more often. We'll go over which fits your lot at the estimate.