Groundbreak Redmond Concrete CompanyGroundbreak Redmond Concrete CompanyRequest an estimate(425) 285-8618

Concrete Floor Installation in Redmond WA - a slab planned for the flooring on top

Old floor cracked, uneven or letting damp up into the flooring? We pour a new concrete floor with the base, joints and moisture worked out first.

A light gray concrete patio floor beside a brick outdoor kitchen with a built-in grill, opening onto a fenced yard.

What does a new concrete floor in Redmond involve?

Concrete floor installation in Redmond is a new slab poured over ground we've dug out and packed firm, so you get a flat, solid floor for a garage, shop, basement or addition that can take tile, wood or carpet on top.

Most floor calls are about a room someone is finishing or fixing, and the first thing I ask is what's going on top of it. The price moves with the size of the room, how much soft dirt has to come out before there's a firm base, and whether tile, wood or carpet goes on top, since that changes what goes under the concrete. The schedule turns more on the permit question and the weather on pour day than on the pour itself. If an old floor is in the way, concrete cutting usually comes first. I come out and look at the room, and that's where you get a figure for yours.

How we handle concrete floor installation

If there's an old floor, I want to know why it failed, because old concrete usually tells you if you break it up and a new slab poured the same way fails the same way. We dig out the topsoil and soft spots down to firm subgrade, the ground the slab actually sits on, and pack the base with a roller or tamper so it doesn't settle later, and we check where the water runs so nothing drains toward the house. If tile, wood or carpet is going on top, the moisture plan gets settled before the pour, since you can't slide anything under concrete that's already there. We pour early instead of in the midday heat that leaves a weak, dusty top, finish the surface to suit what goes on it, and cut control joints, grooves that give the slab a straight line to crack along, on a layout we go over with you first. Then it cures, which is the wait while the concrete gains strength. If the budget gets tight, I'd trim the finish before the base every time, because nobody sees the base on day one and everybody sees it when a floor settles.

A floor job often comes with work around it. If the new room opens onto the pool, we can pour a concrete pool deck at the same time so the levels line up, and when the floor ends up higher than the yard, we build concrete steps to get you down to it.

A slab for tile, wood or carpet

This suits basements, additions and finished rooms, where the concrete is the base for your flooring rather than the floor itself. We settle the moisture protection before the pour and finish the top smooth and flat so the flooring goes down without fighting the slab.

A bare floor for a garage or shop

This suits garages, shops and storage rooms, where the concrete is the finished floor and takes tires, boots and dropped tools. We usually give it a broom finish, a light texture dragged across the wet surface, so it isn't slick when it gets wet.

Why Redmond homeowners call Groundbreak Redmond Concrete Company for floors

I come out and I run the job

I come out for the estimate myself, so the person looking at your room is the one who'll be there on pour day. Our own crew does the work with me running it, which means the joint layout and moisture plan we agree on are what gets built.

In business since 2013, learning from old slabs

We've been in business since 2013, and I learned a good part of the trade breaking up old slabs to see why they failed. Usually it's what was underneath. So before we pour yours, I'll ask what's under the old floor and where the water goes.

Licensed and insured, as Washington requires

We're licensed and insured. The state requires every construction contractor to register with its Department of Labor and Industries, L&I, so check that with anyone you're comparing. When you're ready, call (425) 285-8618 or send the form below with your room size.

Get a price for your new concrete floor

Send us the room size and the flooring you plan to put on top, or call (425) 285-8618, and we'll reply within one business day to set a time. I come out myself for the estimate, which is free and done on site, and there's no obligation to go ahead.

Location
Redmond, WA 98052
Hours
Mon–Fri: 8 AM–11 PM, Sat–Sun: 7 AM–11 PM

What Redmond asks for on a concrete floor installation

Redmond requires a building permit for any project left off the no-permit list on the city's residential permits page, and that list names sidewalks and driveways, not concrete floors. So the list alone doesn't settle your floor. Before we set a date, we find out which city or county office covers your address and what your project calls for, then tell you plainly who'll handle the permit and the inspections. On permitted work the city wants inspections asked for as the job goes and before anything gets covered up, and on a floor the base is exactly what gets covered, so skipping one can hold the job up. The city's code also rates Redmond for moderate weathering and sets its own frost line and earthquake criteria, which is why local rules, not a general rule of thumb, decide the details on a permitted floor.

Around Redmond and over in Kirkland and Bellevue, a lot of our floor calls are garages, shops, basements and additions, and on older houses we often find the old slab went down on dirt that was raked level instead of dug out and packed. That's the part we fix first. Washington also lets eligible customers apply to L&I for recovery payments when a construction contractor's work leaves them out of money, and L&I's contractor rules page is where to read about it.

Concrete floor questions we hear in Redmond

How much does a concrete floor cost in Redmond?

A concrete slab in the Seattle area usually costs about $7 to $14 per square foot, before any staining or stamping, and that's the area's going range, not our quote. Reinforcement moves it, since a slab with rebar, steel bars that hold the concrete together if it cracks, costs more per square foot than a plain pad. Staining or stamping gets budgeted on top, and the on-site estimate gives you the number for your room.

How do I plan a concrete floor installation in Redmond?

Start with what's going on top, because tile, wood or carpet changes what goes under the slab, and that part can't be added once the concrete is in. After that it's the room size, what has to come out, and the permit question we sort out before setting a date. Tell us those on a call or through the form, and I'll come out and look.

Will a new concrete floor crack?

Most likely somewhere, because industry guidance is plain that even a well-designed, well-built floor can't realistically be crack-free. Good joints keep the cracking controlled and small, so the lines show up where you planned them instead of across the middle of the room. That's why we lay out the joints with you, and it's a fair question to ask any contractor.

Does tile or wood flooring need moisture protection under a concrete slab?

Yes, industry guidance calls for protection from moisture coming up through a slab that will be covered with carpet, tile, wood, vinyl or a seamless coating, because water vapor can make the adhesive fail and leave the flooring lifted, warped or stained, sometimes with mold and odors. The same guidance finds a barrier laid right against the bottom of the slab protects the flooring best. The trade-off is extra water rising to the surface that slows finishing, so pour day runs longer, and for a covered floor I think that's worth it.

How long before we can walk on a new concrete floor?

Around Seattle, a new slab should usually be walkable within 48 hours, and it's safer to give it about a week before heavier loads go on it. Concrete keeps curing for about a month, 28 to 30 days, before it's fully cured, so walkable and finished aren't the same thing.

Call (425) 285-8618